1. A traffic study shall be conducted for any
development expected to generate more than 100 peak hour trips or more than 750
average daily trips (ADT). See Section
39-5.05.
2. The traffic study report shall be submitted to the City Engineer and the Community and Neighborhood Services Department for review at the time of
site plan application. See Section
39-5.05.
3. Review of reports shall be done by the City Engineer and may be reviewed by the City's Traffic Engineer Consultant. All fees associated with this review shall be the responsibility of the
applicant.
4. Infrastructure improvement determinations (on-
site and adjacent to the
site) shall be made by the City Engineer based on professional engineering practices, input from other City Departments, and recommendations of the traffic study. All infrastructure improvements shall be made at the same time the
development is constructed, unless other scheduling arrangements are made with the City Engineer. All costs shall be paid for by the
applicant.
5. The City Engineer may require a traffic study for any other
site plan application or may waive this requirement.
See
Sec. 39-10.02: Site design for more information.